|
Here's where we're at right now... |
The company that was contracted to do the work on our bathroom came back out (5 separate times) to fix the drywall, patch around the shower, patch all the holes and tape and mud everything. They even sanded it all down (which is terribly messy and a pain) before wrapping up their job. I probably won't go through Lowe's ever again, but I will call this company directly if I need more work done in my home.
So, the room is painted, the floor is down. And Sunday came very quickly so it was time for my parents to go home. Hopefully they will make it back one more time before Mr. L gets home and I'll have a finished bathroom to show him!
No comments:
Post a Comment